The short answer depends less on a universal rule and more on what the choice changes elsewhere in the project.
Plan solid blocking while the walls are open anywhere a future grab bar may reasonably be needed around the shower, tub, toilet, and transition zones, then photograph and dimension the blocking before the wall is closed.

Why this choice affects more than one line item
Bay Area homes add another layer: older framing, previous remodels, tight access and local inspection requirements can matter more than the room’s square footage. A small bathroom is not automatically a simple bathroom.
Plan solid blocking while the walls are open anywhere a future grab bar may reasonably be needed around the shower, tub, toilet, and transition zones, then photograph and dimension the blocking before the wall is closed. That means the useful question is not only “which option do I like?” It is “what else must change if I choose it, what risk does that create, and does the functional benefit justify the added scope?”
At Together Home Remodeling, we prefer to make these decisions while the plan is still inexpensive to change. Once demolition is underway or materials are ordered, the same change can affect several trades, lead times and inspections. A clear preconstruction decision reduces both rework and the number of allowances that remain unresolved in the contract.
Four variables that can change the recommendation
The expensive bathroom mistakes usually happen when finish selections are made before the wet-area assembly and rough layout are settled. The durable sequence is to resolve function and water management first, then make the visible choices fit that plan.
| Factor | Why it matters |
|---|---|
| Floor elevation and available recess depth | Can materially change scope, price, or feasibility. |
| Drain position and slope to drainage | Should be resolved before final selections are locked. |
| Future mobility and transfer needs | Often affects more than one trade or project phase. |
| Blocking, glass and fixture locations | Helps distinguish a durable solution from the cheapest-looking option. |
These factors also explain why an online average can be misleading. Two bathrooms with similar square footage may have very different scopes when access, structure, existing utilities, drainage, previous work or finish expectations are different. The most useful comparison is a defined assembly against another defined assembly.
What should be resolved before work begins
Before treating this decision as final, we would want the drawings, field conditions and pricing assumptions to agree. The following checkpoints are designed to catch the conflicts that otherwise appear after work has started.
Ask the contractor to identify which parts of the decision are fixed scope, which are allowances, and which could still change after demolition. That distinction is more useful than a single total with no assumptions behind it.
What not to leave unresolved
Most budget surprises are not caused by one expensive finish. They happen when an early assumption is treated as settled and later turns out to affect structure, rough utilities, waterproofing, grading, access or another trade.
- Treating “curbless” as only a tile detail
That can make the initial number look simpler while shifting cost or risk into a later phase. - Waiting until tile is finished to think about grab bars
That can make the initial number look simpler while shifting cost or risk into a later phase. - Adding accessibility hardware without solid backing or usable clearances
That can make the initial number look simpler while shifting cost or risk into a later phase.
A stronger process is to resolve high-impact unknowns first, keep optional finish upgrades visible as separate choices, and avoid using a low initial number to hide a scope item that the project is likely to need anyway.
A practical example
The homeowner does not need mobility support today but wants the bathroom to remain usable later. Adding blocking and resolving the shower floor now costs far less than opening finished tile in a future retrofit.
Connect this decision to the full project plan
This question is one piece of a larger planning sequence. For the complete framework, see our broader guide to bathroom remodeling. It covers the broader order of decisions so one isolated choice does not create conflicts later.
If the project is moving from research into scope definition, our bathroom remodeling services page explains the service and the types of work we coordinate across design, planning and construction.
For Bay Area remodeling and outdoor projects, we focus first on scope clarity: existing conditions, the intended end use, permit and technical dependencies, materials, and a construction sequence that can actually be built.
A few practical follow-up questions
Where Should Grab Bars and Blocking Be Planned During a Bathroom Remodel?
Plan solid blocking while the walls are open anywhere a future grab bar may reasonably be needed around the shower, tub, toilet, and transition zones, then photograph and dimension the blocking before the wall is closed.
What should be checked before making this accessibility decision?
At minimum, review coordinate slope and drain before framing is closed, install blocking in likely grab-bar zones, and photograph and dimension hidden blocking. The goal is to resolve dependencies before final pricing and finish work.
Why can two reasonable contractors recommend different approaches?
They may be making different assumptions about floor elevation and available recess depth, drain position and slope to drainage, and future mobility and transfer needs. Ask each proposal to state those assumptions so the recommendations can be compared on the same scope.
The practical takeaway
Plan solid blocking while the walls are open anywhere a future grab bar may reasonably be needed around the shower, tub, toilet, and transition zones, then photograph and dimension the blocking before the wall is closed. Define the surrounding scope before comparing prices, and make the decision while the plan is still easy to change.